Docs

Content calendar

Calendar overview

Last updated:

The Calendar month grid — statuses, what each day does on click, live generation steps and the plan's shape.

Your content calendar is the month-long plan Clodix built when you set up your site: one topic per day, backed by a real keyword. This page explains the grid, what each kind of day does when you click it, and how the plan is shaped.

The Calendar month grid with planned, auto-filled and written days, and the legend at the bottom

The grid

A standard month view, Monday first, with Previous month / Next month arrows and a Today button to jump back. Each cell is one day; a day holds at most one topic or article.

Legend and statuses

StatusWhat it means
PlannedA topic is scheduled for this day, waiting for its date or your click
GeneratingThe article for this day is being written right now
DraftThe article is finished and waiting for you to review or publish it
ScheduledThe article is finished and will publish itself on its planned day
PublishedLive on your site
Clodix auto-scheduledThe sparkle marker on empty days while autopilot is on. It doesn't mean a topic is placed there — see Empty days with autopilot on

What each kind of day does on click

  • Planned day — opens a "Scheduled Article" popup showing the keyword, its difficulty and estimated traffic, and the credit cost. See Schedule, move and remove topics for the buttons.
  • Generating day — shows the pipeline's live progress instead of opening anything:
    1. Researching the topic cluster…
    2. Researching the topic…
    3. Building the outline…
    4. Writing the article…
    5. Making it sound human…
    6. Checking uniqueness…
    7. Creating the cover…
    8. Drafting social posts…
    9. Scoring SEO…

Each line is shown with its position, like 4/9. The first step does real work only for the first article on a new topic cluster; for every other article it passes by almost instantly.

This updates on its own while you watch — no need to reload the page.

  • Written day (Draft / Scheduled / Published) — opens the article in the editor.
  • Empty future day — opens a "Schedule Article" popup to pick a keyword for that day. See Schedule a topic on an empty day.
  • Empty day with autopilot on — reads "Clodix auto-fills this day" instead, and clicking it opens "Clodix has this covered", with Let Clodix Handle It and Schedule Myself. See Empty days with autopilot on for what that really means.
  • Past day — not clickable; you can't plan into the past.

Empty days with autopilot on

When Autopilot is on, every empty future day shows Clodix auto-fills this day. Treat that as a marker that you don't have to do anything — not as a promise for that particular day. Autopilot only writes topics that are already on your calendar and due, and it doesn't go back to fill empty days between them; those gaps are part of the plan's rhythm (see below). It adds new topics only after the last one on your calendar. If you want a specific keyword on an empty day, choose Schedule Myself and pick one.

The plan shape

Your first plan lays out roughly 22 topics across a 30-day window: the first 14 days get a topic every single day, and after that topics appear every other day. The gaps in the second half are intentional — they are what the schedule looks like once the initial burst slows to a steady pace, not missing data.

Once less than a week of planned topics is left, the autopilot adds about two more weeks of topics after the last one already on your calendar — the same day it writes that day's article. Up to half of each new batch — its first days — goes to questions people ask AI assistants in your niche that none of your articles answers yet, one article per question. So with Generate articles automatically on, your calendar always shows the week ahead and beyond. Gaps between topics are never filled in: new topics only go after the end. See Schedule, move and remove topics for adding topics yourself, and Rebuild your plan for replacing the plan wholesale.

FAQ

Why does my calendar have empty days between topics?

That's by design — after the first two dense weeks, your plan spaces topics out every other day. Nothing is missing, and autopilot won't fill those days later; you can add a topic to any empty day yourself.

Can I have two topics on the same day?

No — one topic per day. Drag a planned topic to a different empty day if you want to move it, or remove it and schedule a different keyword instead.

What happens when I run out of planned topics?

You don't: once less than a week of topics is left, the autopilot adds about two more weeks after the end of your plan on its next article day. If you turned Generate articles automatically off, nothing is generated and no topics are added — add topics yourself, or switch it back on.